← Prior month
Next month →

Close — June 2026

Period open
Revenue Allocation v2 C3 JE Builder Candidate Bundling

Work top to bottom — each step has one main action. Green edge = done or healthy, amber = worth a look, red = needs attention before moving on.

1

Check the data is fresh

NGP contributions: synced Jul 25, 2026, 5:01 AM ET

Sage GL feed: delivered Jul 25, 2026, 2:18 AM ET, window Jan 5, 2025 – Jul 22, 2026

Both sources are current — nothing to do here.

2

Reconcile revenue & fix what's flagged

Sage vs NGP for June 2026: match

Unmapped source codes: 0 ($0.00) · Slate batches needing assignment: 0 · NEEDS DETAILS open: 1

Anything flagged can be fixed right on the reconcile screen — map, assign, or exclude in place.

3

Run the revenue allocation & export the JEs

No journal entries built for this period yet.

Pre-run checks on the Run page confirm everything from steps 1–2 is ready before the button unlocks.

4

Build the C3 journal entries (Education Fund)

JEs for this period: 0

5

Generate the candidate bundling entries

Generated for this period: Yes STAT-CAND-2026-06 · posted STAT-CAND-2026-06 · superseded

To resolve first: unmapped ActBlue entities 0 · junk refcodes 1

6

Review & wrap up

Open exceptions for this period or earlier: 2

candidate_bundling / junk_refcode: 1 · revenue_allocation / needs_details: 1

Badge meanings — exported CSV downloaded, not yet seen posted in Sage · posted found posted in Sage · superseded replaced by a newer export · error needs attention · ⚠ Sage totals mismatch (see JE Registry)