← Prior month
Next month →

Close — May 2026

Period open
Revenue Allocation v2 C3 JE Builder Candidate Bundling

Work top to bottom — each step has one main action. Green edge = done or healthy, amber = worth a look, red = needs attention before moving on.

1

Check the data is fresh

NGP contributions: synced Jul 25, 2026, 5:01 AM ET

Sage GL feed: delivered Jul 25, 2026, 2:18 AM ET, window Jan 5, 2025 – Jul 22, 2026

Both sources are current — nothing to do here.

2

Reconcile revenue & fix what's flagged

Sage vs NGP for May 2026: mismatch

Unmapped source codes: 0 ($0.00) · Slate batches needing assignment: 0 · NEEDS DETAILS open: 0

Anything flagged can be fixed right on the reconcile screen — map, assign, or exclude in place.

Open cross-checks (1)
WARNING 314 Action Fund + Non-Contribution (201 + 202): -$200.00
PAC pair — the accrual JE reclasses between 201 and 202; compared combined (they net across the pair).
3

Run the revenue allocation & export the JEs

No journal entries built for this period yet.

Pre-run checks on the Run page confirm everything from steps 1–2 is ready before the button unlocks.

4

Build the C3 journal entries (Education Fund)

JEs for this period: 0

5

Generate the candidate bundling entries

Generated for this period: Yes STAT-CAND-2026-05 · exported ⚠ STAT-CAND-2026-05 · superseded STAT-CAND-2026-05 · superseded STAT-CAND-2026-05 · superseded STAT-CAND-2026-05 · superseded ⚠ STAT-CAND-2026-05 · superseded STAT-CAND-2026-05 · superseded STAT-CAND-2026-05 · superseded STAT-CAND-2026-05 · superseded STAT-CAND-2026-05 · superseded

6

Review & wrap up

No open exceptions — once every export badge reads posted, the month is done.

Badge meanings — exported CSV downloaded, not yet seen posted in Sage · posted found posted in Sage · superseded replaced by a newer export · error needs attention · ⚠ Sage totals mismatch (see JE Registry)