Reconcile
0d ago
Pipeline sync
Sep 15, 2026, 8:31 AM ET (pipeline_incremental) 0d ago
Sage GL delivery
Sep 15, 2026, 1:29 AM ET — window through Sep 9, 2026 4
Unassigned slate batches
$36,327.00 across 4 batch(es) 0
Unmapped in-use codes
every in-use code maps
Pipeline sync
Sep 15, 2026, 8:31 AM ET (pipeline_incremental) 0d ago
Sage GL delivery
Sep 15, 2026, 1:29 AM ET — window through Sep 9, 2026 4
Unassigned slate batches
$36,327.00 across 4 batch(es) 0
Unmapped in-use codes
every in-use code maps
All entities
| Month / Entity | Sage Net Revenue | NGP Contributions | Difference | Status | Run |
|---|---|---|---|---|---|
| ▶ Sep 2026 (4 entities) | $129,129.68 | $240,691.01 | -$111,561.33 | ✗ Mismatch | Build JEs → |
| 314 Action (101) |
$12,011.64
$12,011.64 CR |
$18,586.45
375 contributions |
-$6,574.81 | ✗ | |
|
314 Action Fund + Non-Contribution (201 + 202)
PAC pair — the accrual JE reclasses between 201 and 202; compared combined (they net across the pair). |
$109,081.57
$109,081.57 CR |
$185,441.09
5486 contributions |
-$76,359.52 | ✗ | |
| 314 Action Victory Fund (301) | $0.00 |
$250.00
1 contribution |
-$250.00 | ✗ | |
|
Impact Slate — HD + JF (401 + 403)
NGP export can't split HD vs JF — compared combined. |
$8,036.47
$8,036.47 CR |
$36,413.47
337 contributions |
-$28,377.00 | ✗ | |
| Unassigned slate batch: Slate FS26 AB 09062026 | — | $6,875.00
123 rows |
— | … | |
| Unassigned slate batch: Slate P26Aug AB 09062026 | — | $1,075.00
33 rows |
— | … | |
| Unassigned slate batch: Slate FS26 AB 09132026 | — | $26,618.00
135 rows |
— | … | |
| Unassigned slate batch: Slate P26Aug AB 09132026 | — | $1,759.00
45 rows |
— | … | |
|
Non-NGP revenue (interest, list rental, invoices)
Books to the revenue range in Sage but never corresponds to an NGP contribution — removed from the Sage total above. |
$1,930.91
2 lines |
— | — |
Note: reconciliation is penny-exact — any non-zero gap is a Mismatch. Reconciling items that legitimately have no NGP counterpart (interest, list rental, non-NGP transfers, exclusions, unassigned slate) are carved into their own rows and removed from the compared totals, so what remains should net to zero. A known gap you can't clear yet (e.g. a Sage-side reclass still pending) can be Acknowledged so it stops blocking the close; if that gap later changes, the acknowledgement goes stale and the row re-surfaces. The 401 + 403 row is compared combined because the NGP export can't split Impact Slate HD from JF.